Modern Tyres

The Project

Modern Tyres

  • Construction of 100,000sq foot commercial premises
  • Structural Steel Portal Frames Building with insulated roof and wall cladding
  • Insulated masonry construction
  • Steel roller shutters and doors
  • Aluminium Curtain walling sections
  • Dock levellers at lorry and van loading bays
  • Specialised Civil Drainage and attenuation works
  • Extensive area of site works
  • Foundations were reinforced concrete pad and ring beam foundations
  • Jointless fibre mesh industrial flooring

Start Date

2020 (Ongoing)

Team

Architect:
Delahunt Laverty

Structural Engineers:
Nicholas O’Dwyer

M&E Engineers:
Advance M&E

Client

Modern Tyres

Project Quantity Surveyor:

Macauley Heaney Partnership Newry

Working with the Client and Design Team as partners, Kelly Brothers consistently embrace and develop methods of reducing construction costs and site waste by maximising off-site fabrication, streamlining construction methods and using alternative construction techniques.