Property

Areema Drive Dunmurry

The Project

Areema Drive

Construction of 22 number dwellings – mixture of 2 person 1 bed, 3 person 2 bed, 5 person 3 bed and complex needs bungalows:

  • Concrete driven piles with precast driven floors.
  • Traditional masonry build.
  • SBD Standards (secure by design).
  • Lifetime Homes.
  • Waste water pumping station to be installed on site.
  • Diversion of existing drainage and utilities, remediation of contaminated area.
  • Preservation of existing play area within the site during construction works.

Start Date

2020 (Ongoing)

Team

Architect:
JNP Architects

Project Quantity Surveyor:
AG Crawford

Mechanical & Electrical Engineers:
R&H Design Services Limited

Structural & Civil Engineering:
BWM

Working with the Client and Design Team as partners, Kelly Brothers consistently embrace and develop methods of reducing construction costs and site waste by maximising off-site fabrication, streamlining construction methods and using alternative construction techniques.