Construction of 22 number dwellings – mixture of 2 person 1 bed, 3 person 2 bed, 5 person 3 bed and complex needs bungalows:
- Concrete driven piles with precast driven floors.
- Traditional masonry build.
- SBD Standards (secure by design).
- Lifetime Homes.
- Waste water pumping station to be installed on site.
- Diversion of existing drainage and utilities, remediation of contaminated area.
- Preservation of existing play area within the site during construction works.

Start Date
2020 (Ongoing)
Client
Mechanical & Electrical Engineers:
R&H Design Services Limited
Structural & Civil Engineering:
BWM

Working with the Client and Design Team as partners, Kelly Brothers consistently embrace and develop methods of reducing construction costs and site waste by maximising off-site fabrication, streamlining construction methods and using alternative construction techniques.