The Project
Ardmore, Armagh
- Construction of 12 houses and completion finishing of 11 existing houses
- 23 Units in total
- Timber frame – Enclosed panel
- SBD Standards
- Lifetime Homes
- Design and install of a Pumping Station
- Up to 6 Metres deep main drainage
- Concrete roof tiles and Sto silicone based render.
- Green terramesh retaining walls and Attishon and Glover Dry stone wall

Start Date
2020 (Ongoing, phase 2)
Team
Architect:
RPP Architects
Project Quantity Surveyor:
Naylor & Devlin, Chartered Quantity Surveyor
Mechanical & Electrical Engineers:
Simpson & Crawford Consulting
Structural & Civil Engineering:
Albert Fry Associates

Working with the Client and Design Team as partners, Kelly Brothers consistently embrace and develop methods of reducing construction costs and site waste by maximising off-site fabrication, streamlining construction methods and using alternative construction techniques.