  • Construction of 12 houses and completion finishing of 11 existing houses
  • 23 Units in total
  • Timber frame – Enclosed panel 
  • SBD Standards
  • Lifetime Homes
  • Design and install of a Pumping Station
  • Up to 6 Metres deep main drainage
  • Concrete roof tiles and Sto silicone based render.
  • Green terramesh retaining walls and Attishon and Glover Dry stone wall

Start Date

2020 (Ongoing, phase 2)

Team

Architect:
RPP Architects

Project Quantity Surveyor:
Naylor & Devlin, Chartered Quantity Surveyor

Mechanical & Electrical Engineers:
Simpson & Crawford Consulting

Structural & Civil Engineering:
Albert Fry Associates

Working with the Client and Design Team as partners, Kelly Brothers consistently embrace and develop methods of reducing construction costs and site waste by maximising off-site fabrication, streamlining construction methods and using alternative construction techniques.